This two structure main terminal will also include a satellite concourse connected by pedestrian walkway.
Size: 640,000 sq ft
Architect: HOK Consulting
Completion Date: 2005
LEED Status: LEED Certified
Eaton Products: Pow-R-Command Lighting, MV switchgear including panelboards and switchboards, variable frequency drives and
motor control centers.
With help from an array of Eaton solutions, Terminal A at Logan became the world's first LEED certified Airport facility in
2006.