Electrical - Eaton Canada | Edmonton Power Centre - Portable or Stationary Substations / Mine Power Substation
Eaton Logo, links to the Eaton homepage

Edmonton Power Centre

Product

Portable or Stationary Substations / Mine Power Substation

The Edmonton Power Center manufactures and assembles off-site constructed power substations up to 20 MVA - 36 KV primary. These Substations can be shipped to job sites and be portable or fixed mounted as required for each application. Substations are built with all necessary primary and secondary Switchgear, Instrumentation, PLC and Communication links for remote operation if necessary. Electrical enclosures or housing supplied with these substations are environmentally controlled and can meet all weather conditions.


10 MVA - 25 kV Primary Unit Substation. Primary Switchgear is weather- proof construction. Secondary Switchgear and Controls are housed in a environmentally controlled building.


Unit Substations are constructed off-site and transported to on going projects for moveable or padmount installation.


500 KVA - 15 kV -480 Volt portable construction site units. Rugged outdoor construction used as Permanent, Temporary or Standby Power Distribution.


Easily handled and transported from one project to another.


Skid Mounted Power Distribution built to restricted heights for underground mining operations.


Skid Mounted Power Distribution built to restricted heights for underground mining operations.

 









We manufacturer and assemble off-site constructed Power Substations up to 20 M.V.A. - 36 K.V. primary.
E-mail this page Print this page
Copyright ©2009-2013 Eaton
All rights reserved.